Prefabricated houses being installed at the Malabar Wastewater Site
Activities at the site as at May 2015 include:
- Construction of buildings for temporary production area.
- T&TEC temporary power supply.
- Telephone and Internet connection by FLOW.
- Temporary access road surfacing.
- Continued construction of temporary worker facilities.
- Continued construction of AECOM offices.
- Construction of temporary site drainage.
- Construction of temporary on-site WWTP.
- Clearing and grubbing of site for Influent Pumping Station (IPS);
- Excavation of IPS site.
- Filling and compacting slope on south boundary of site.
- Installing site safety signs.
- Continuing to establish survey controls for project.
- Constructing temporary fence (along the northern site boundary).
- Construction of the temporary and permanent water connection.